Loading, please wait ...

Non Functional Requirements in UP

  • Handling Other Requirements in UP
  • Non Functional Requirements Artifacts
  • Revision...
    View Complete Description
    ×

    Topic Summary

    • Handling Other Requirements in UP
    • Non Functional Requirements Artifacts
    • Revision History
    • Introduction
    • Functionality
    • Usability
    • Reliability
    • Performance
    • Supportability
    • Adaptability
    • Free Open Source Components
    • Configurability
    • Elements of Supplementary Specifications

    Topic CLO's

    Click on any CLO below to enable/disable it against the topic.

    CLO-6 Explain basic concepts of object-oriented software engineering using UML.
    Enable

    Explain basic concepts of object-oriented software engineering using UML.
    CLO-7 Develop OOSE design for problems based on real-world scenarios.
    Enable

    Develop OOSE design for problems based on real-world scenarios.
    CLO-8 Explain the fundamentals of software project management and software life cycle methodologies.
    Enable

    Explain the fundamentals of software project management and software life cycle methodologies.
    CLO-9 Develop a “real world” software system prototype using Object Oriented Software Engineering.
    Enable

    Develop a “real world” software system prototype using Object Oriented Software Engineering.
Topic Questions:
48
MCQs T/F FiB SQ
14 14 15 5
Question Type Legends

Easy

Medium

Difficult

Multiple Choice Questions for Non Functional Requirements in UP

  • ×

    Hidden Questions!

    Some MCQs are not visible. Usually teachers hides their visibility if they are few in number. Subject Expert recommends them to have more than 70+ questions against the topic and make them public.

  • 1 Other requirements during inception can be stored on ______ of a company.
    1. Glossary
    2. Wiki Web site
    3. User Manual
    4. Sticky note

  • 2 It is better to analyze for _____ and ____ during inception.
    1. performance
    2. reliability
    3. Both a and b
    4. None

  • 3 Which one of the following is an elaboration phase artifact
    1. Suplimentary specification
    2. Glossary
    3. Vision
    4. Software architecture document

  • 4 Which one is not artifact of OTHER Requirements
    1. Glossary
    2. Vision Statement
    3. Supplementry
    4. System Sequence Diagram

  • 5 Supplementary specification doesn't include
    1. System Sequence Diagram
    2. Use Case Diagram
    3. Data flow Diagram
    4. All of above

  • 6 _____ Risks are identified and mitigated in elaboration phase.
    1. Major
    2. Minor
    3. All risks
    4. None of these

Contact Us

support@subexpert.com
Write to Us View Help
Subject Expert Logo

Subject Expert

Learn, Evaluate and Optimize

Follow Us
Facebook Switch Display Mode Enable Translation
© 2024 - Subject Expert