Loading, please wait ...

True/False Questions for Inspections and Walkthroughs

  • 1 Inspections are generally considered more formal and significant contributors to the overall level of Software Quality Assurance (SQA) than walkthroughs. True View Answer
    Explaination:
    The level of formality differentiates a walkthrough from an inspection; because inspection findings contribute to corrective action processes and involve more rigorous preparation, they are considered more significant contributors to SQA [6].

  • 2 In a walkthrough team, the 'Standards Enforcer' is the specialized professional responsible for focusing on maintainability, flexibility, and testability issues. False View Answer
    Explaination:
    The 'Standards Enforcer' role focuses on locating deviations from standards and procedures, while the 'Maintenance Expert' focuses on maintainability, flexibility, and testability issues [18].

  • 3 To maintain effectiveness and prevent participant fatigue, it is recommended that an inspection or walkthrough session should not exceed 2 hours in duration. True View Answer
    Explaination:
    Both inspections and walkthroughs are recommended to be uninterrupted meetings of roughly 90 to 120 minutes (2 hours) in duration [2, 15-17].

  • 4 According to the Galin textbook, walkthrough findings are typically transmitted to the internal Corrective Action Board (CAB) to support organization-wide process improvements. False View Answer
    Explaination:
    Walkthroughs are generally limited to comments on the specific document reviewed, whereas the findings of inspections are incorporated into organization-wide corrective action processes via the CAB to improve overall productivity and reduce future defects [6, 14].

  • 5 During an inspection session, the simple act of the programmer reading the program aloud statement-by-statement is often a remarkably effective error-detection technique. True View Answer
    Explaination:
    The programmer usually finds many of the detected errors themselves simply by narrating the logic of the program to an audience [13].

  • 6 Peer reviews such as inspections and walkthroughs are intended to replace computer-based testing (CBT) as a more cost-effective method of detecting logic errors. False View Answer
    Explaination:
    Inspections/walkthroughs and computer-based testing are complementary techniques; error-detection efficiency will suffer if one or the other is not present in the SQA process [11, 12].

  • 7 The standard procedure for a code walkthrough involves participants 'playing computer' by mentally executing a small set of test cases through the program's logic. True View Answer
    Explaination:
    In a walkthrough meeting, a tester brings a small set of test cases which participants mentally execute, monitoring the state of the program on paper or a whiteboard as they walk through the logic [9, 10].

  • 8 A major difference between the two peer review methods is that members of an inspection team are required to perform preparatory work, whereas walkthrough participants are not. True View Answer
    Explaination:
    The sources state that inspection team members must conduct preparatory work (reading the document and listing comments) before the session, while walkthrough participants are not requested to make meaningful preparations [6-8].

  • 9 In a code inspection, the moderator should ideally be the author of the program to ensure the team has the best technical insights into the code. False View Answer
    Explaination:
    The moderator is expected to be a competent programmer but should not be the author of the program and does not necessarily need to be acquainted with the specific details of the project beforehand [3-5].

  • 10 The primary objective of the review meeting in an inspection or walkthrough is to find and document solutions for the detected errors. False View Answer
    Explaination:
    The objective of the participant conference is to find errors but not to find solutions to those errors; the session is intended to test the program, not to debug it [1, 2].

  • 11 Programmers tend to make more mistakes when correcting an error found during CBT than they make during NCBT True View Answer

  • 12 Optimal number of group of developers in Walkthrough is three or four. True View Answer

  • 13 Optimal number of group of developers in Walkthrough is three or four. True View Answer

  • 14 Programmers tend to make more mistakes when correcting an error found during CBT than they make during NCBT. True View Answer

  • 15 The earlier errors are found, the costs of correcting them is higher as well. False View Answer

  • 16 A good readable code is big boost in comprehensive testing and debugging. True View Answer

  • 17 Programs are written solely for machines not for developers, is a valid understanding. False View Answer

Contact Us

support@subexpert.com
Write to Us View Help
Subject Expert Logo

Subject Expert

Learning Experience Platform

Follow Us
Facebook Switch Display Mode Enable Translation
© 2026 - Subject Expert)